Confirm the Need
Rule out an outlet blockage or failed dosing component before replacing trenches.
Protect Usable Soil
Keep vehicles, buildings and stored materials off the proposed field and reserve area.
Choose an Approved Design
Soil, groundwater and space determine whether gravity, dosing or advanced treatment fits.
Install and Keep Records
Coordinate TDEC inspection before cover. Keep the final layout and maintenance instructions.
Read our Murfreesboro septic sizing, materials and care guide.